Energy efficiency
|
Thermal performance
|
- Insulate ceilings to the Best Practice standard or higher as outlined in SNZ PAS 4244:2003.
- Insulate under the floor (where possible) to as high a standard as practicable
- Where renovations are already planned, install wall insulation to meet Best Practice as outlined in SNZ PAS 4244:2003.
- Where glazing or windows are in need of replacement, install low-e double glazing
|
|
|
Space heating
|
- Install a pellet burner or low-emission wood burner appropriately sized for the dwelling or, if not possible, an Energy Star rated heat pump with a coefficient of four or better.
- Heat transfer systems, if required, to ensure heat is supplied to all bedrooms and living spaces
|
|
|
Hot water
|
- Install a solar hot water system or heat pump hot water system
- Install low-flow shower heads (7-9 L/min)
|
|
|
Energy efficient bundle
|
- CFL lightbulbs, draught stopping of major draughts, polythene under floor, washing line if there is none
|
|
Water efficiency
|
Low-flow fittings
|
- Replace full-flush cisterns with AAA-rated dual-flush (3/6 litre) cisterns or replace whole toilet with AAAA-rated dual-flush (3/4.5 litre) toilets
- Put flow restrictors on kitchen, bathroom and outdoor taps
- Plumbing check – fix leak
|
| |
Rainwater tanks
|
- 2000L (5000L if sufficient space) tank to supply outdoor uses, toilet and washing machine supply
|
| |
Greywater reuse
|
- In areas of low rainfall, or where on-site sewage treatment systems are in place, reuse of greywater for outdoor uses or toilet
|
|
Indoor environment quality
|
Ventilation
|
- Install a showerdome or mechanical ventilation system in bathroom – vented to outside
- Install a rangehood in kitchen – vented to outside
- Provide venting to outside for any driers
- Install strip-passive vents in windows in living spaces or security stays to enable windows to be left open
|
|
Waste
|
Composting
|
- Provide worm farm or compost bin
|